Floor Lamp

Floor Lamp

分类:

GET IN TOUCH





    FAQ

    How can I get a quotation?

    Anno lighting would like to give an idea about price based on the drawing or buying list, and then the Cost Control Depart of Anno Lighting will bring out a solution report correspondingly.

    What is your products quality

    Anno Lighting established a complete set of quality standards that align with its worldwide counterparts, and a complex quality management system that keeps the standards on track.

    Production time ?

    Anno Lighting would bring out a Production Schedule for each project, detailing the specific production control points, making sure the leading time won’t be exceeded. Based on our experience, 30-40 days would be needed for one hotel project.

    It is my first time to import from China, what should I do?

    Anno Lighting provide One-Stop solution for hotel lighting purchases, from lighting design, material selecting, order production, loading containers to document preparation to maximally facilitate the importing issues.

    On-site installation?

    Anno Lighting has a professional On-Site installation team that handles oversea hotel lighting projects. The charge would be negotiated at the quotation stage.

    滚动至顶部