Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/wwwroot/annolighting.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/wwwroot/annolighting.com/wp-includes/functions.php on line 6114

Notice: 函数 _load_textdomain_just_in_time 的调用方法不正确astra 域的翻译加载触发过早。这通常表示插件或主题中的某些代码运行过早。翻译应在 init 操作或之后加载。 请查阅调试 WordPress来获取更多信息。 (这个消息是在 6.7.0 版本添加的。) in /www/wwwroot/annolighting.com/wp-includes/functions.php on line 6114

Notice: 函数 _load_textdomain_just_in_time 的调用方法不正确astra-addon 域的翻译加载触发过早。这通常表示插件或主题中的某些代码运行过早。翻译应在 init 操作或之后加载。 请查阅调试 WordPress来获取更多信息。 (这个消息是在 6.7.0 版本添加的。) in /www/wwwroot/annolighting.com/wp-includes/functions.php on line 6114
garden lamp -

garden lamp

garden lamp

Category:

GET IN TOUCH





    FAQ

    How can I get a quotation?

    Anno lighting would like to give an idea about price based on the drawing or buying list, and then the Cost Control Depart of Anno Lighting will bring out a solution report correspondingly.

    What is your products quality

    Anno Lighting established a complete set of quality standards that align with its worldwide counterparts, and a complex quality management system that keeps the standards on track.

    Production time ?

    Anno Lighting would bring out a Production Schedule for each project, detailing the specific production control points, making sure the leading time won’t be exceeded. Based on our experience, 30-40 days would be needed for one hotel project.

    It is my first time to import from China, what should I do?

    Anno Lighting provide One-Stop solution for hotel lighting purchases, from lighting design, material selecting, order production, loading containers to document preparation to maximally facilitate the importing issues.

    On-site installation?

    Anno Lighting has a professional On-Site installation team that handles oversea hotel lighting projects. The charge would be negotiated at the quotation stage.

    滚动至顶部